Endre søk
RefereraExporteraLink to record
Permanent link

Direct link
Referera
Referensformat
  • apa
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Annet format
Fler format
Språk
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Annet språk
Fler språk
Utmatningsformat
  • html
  • text
  • asciidoc
  • rtf
Reducering av ledtider i en kundorderstyrd produktion: En fallstudie utförd på **********
Jönköping University, Tekniska Högskolan, JTH, Industriell organisation och produktion.
Jönköping University, Tekniska Högskolan, JTH, Industriell organisation och produktion.
2020 (svensk)Independent thesis Basic level (university diploma), 10 poäng / 15 hpOppgaveAlternativ tittel
Reduction of lead time when all production is against order (engelsk)
Abstract [sv]

As a result of the globalization around the world, customer demands are increasing and competitors are growing, not least in the production industry. Due to this, companies are constantly forced to improve and develop their business in forms of both production and working environment. ********** is one of the worlds largest manufacturing companies, in the field of ventilation systems. The company has today identified problems with delivery times with their product ReCooler, which is a component in their ventilation system eQ Prime.

The purpose of this report has been to examine the production flow for the ReCooler and identify the potential reasons to why the lead time is so long. Once the problem areas have been identified, improvement proposals have been developed with the goal of implementing these in the production. Further, in the future being able to reduce lead times and increase delivery precision towards customers.

Many literature studies were reviewed, and the method of value stream mapping was considered appropriate for the purpose of the study. The value stream mapping generated one mapping of the current flow in the production and one of the desirable future flows. Thenceforth, a gap in between was found in which the improvement potential could be seen.

By examining the gap and areas of improvement, various improvement proposals were developed. The main focus in the proposals was changing one part of the production flow, and manufacture rotors towards a warehouse instead of producing them on demand.

The conclusion was to implement a supermarket, a production line and Kanban-cards. These improvement proposals would be resulting in shorter delivery lead times, production lead times and better delivery precision.

 

 

Keywords: Lean production, Kaizen, Value Stream Mapping, Production Flow.

sted, utgiver, år, opplag, sider
2020.
Emneord [sv]
Lean production, Kaizen, värdeflödesanalys, produktionsflöde
HSV kategori
Identifikatorer
URN: urn:nbn:se:hj:diva-49907ISRN: JU-JTH-MTA-1-20200231OAI: oai:DiVA.org:hj-49907DiVA, id: diva2:1448672
Fag / kurs
JTH, Mechanical Engineering
Veileder
Examiner
Tilgjengelig fra: 2020-06-30 Laget: 2020-06-29 Sist oppdatert: 2025-10-13bibliografisk kontrollert

Open Access i DiVA

fulltext(2307 kB)291 nedlastinger
Filinformasjon
Fil FULLTEXT01.pdfFilstørrelse 2307 kBChecksum SHA-512
5a2c8b514d5516fb3d625353d6af5978d06a100c4cbec4d3cdcb124713110648a3b0cf96e56f4d440f1acdc2d7318d6d589180ece6bcb9cd26e055ff7e862563
Type fulltextMimetype application/pdf

Av organisasjonen

Søk utenfor DiVA

GoogleGoogle Scholar
Totalt: 294 nedlastinger
Antall nedlastinger er summen av alle nedlastinger av alle fulltekster. Det kan for eksempel være tidligere versjoner som er ikke lenger tilgjengelige

urn-nbn

Altmetric

urn-nbn
Totalt: 449 treff
RefereraExporteraLink to record
Permanent link

Direct link
Referera
Referensformat
  • apa
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Annet format
Fler format
Språk
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Annet språk
Fler språk
Utmatningsformat
  • html
  • text
  • asciidoc
  • rtf