Change search
CiteExportLink to record
Permanent link

Direct link
Cite
Citation style
  • apa
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Other style
More styles
Language
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Other locale
More languages
Output format
  • html
  • text
  • asciidoc
  • rtf
Effektivisering av intern materialhantering
Jönköping University, School of Engineering, JTH, Industrial Engineering and Management.
Jönköping University, School of Engineering, JTH, Industrial Engineering and Management.
2021 (Swedish)Independent thesis Basic level (university diploma)Student thesisAlternative title
Improving an internal material handling system (English)
Abstract [en]

This degree project has been carried out at Jönköping University of Technology where the study has been executed in collaboration with the electronics manufacturing company Kitron AB. The purpose of this study was to reduce waste associated with material handling and to develop action proposals with focus on material supply and production layout. 

A case study was executed at the company where the study was defined to one of the production departments. Different methods were being used to gather data which has been analyzed based on the theoretical framework. Time studies has been carried out to investigate how much time the operator spend on activities related to material handling. The study showed that the total material handling time in that department added up to 44,8% of an employment. Furthermore, analyzes of the current material handling system, the items in the department and the current layout design have been made.

Conclusion from this case study is that a new material supply system and a new layout to reduce the material handling waste is required. Using theory, two solution proposals has been presented showing how a material supply system can increase efficiency and decrease the waste. 

Finally, one of the two solution proposals is recommended for the company based on an evaluation from five criteria. The recommended solution results in a reduced working space by 32,2% and reduced time waste on material handling. A discussion regarding further research is presented at the end. 

Place, publisher, year, edition, pages
2021. , p. 70
National Category
Mechanical Engineering
Identifiers
URN: urn:nbn:se:hj:diva-53927ISRN: JU-JTH-MTA-1-20210275OAI: oai:DiVA.org:hj-53927DiVA, id: diva2:1577058
External cooperation
Kitron AB
Subject / course
JTH, Mechanical Engineering
Supervisors
Examiners
Available from: 2021-08-16 Created: 2021-07-01 Last updated: 2025-10-13Bibliographically approved

Open Access in DiVA

fulltext(14328 kB)280 downloads
File information
File name FULLTEXT01.pdfFile size 14328 kBChecksum SHA-512
bc47e4551005cb28dca85c9eaff6f37eb4281690d101d4cbb74042213ef53b58152c33735b1d28ddfe330433304c5371692479e6fbf4298d92f008f79c4c5ae2
Type fulltextMimetype application/pdf

By organisation
JTH, Industrial Engineering and Management
Mechanical Engineering

Search outside of DiVA

GoogleGoogle Scholar
Total: 280 downloads
The number of downloads is the sum of all downloads of full texts. It may include eg previous versions that are now no longer available

urn-nbn

Altmetric score

urn-nbn
Total: 413 hits
CiteExportLink to record
Permanent link

Direct link
Cite
Citation style
  • apa
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Other style
More styles
Language
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Other locale
More languages
Output format
  • html
  • text
  • asciidoc
  • rtf