Change search
CiteExportLink to record
Permanent link

Direct link
Cite
Citation style
  • apa
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Other style
More styles
Language
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Other locale
More languages
Output format
  • html
  • text
  • asciidoc
  • rtf
Reducering av kapitalbindning orsakad av materialflöden: Fallstudie på företaget Kitron AB
Jönköping University, School of Engineering.
Jönköping University, School of Engineering.
2022 (Swedish)Independent thesis Basic level (degree of Bachelor), 10 credits / 15 HE creditsStudent thesisAlternative title
Reduction of capital tied up caused by the materialflow (English)
Abstract [sv]

Arbetet har utförts vid Tekniska Högskolan i Jönköping där en studie har genomförts i samarbete med Kitron AB som är ett elektroniktillverkande företag. Kitron strävar efter att reducera kapitalbindningen för att vara kostnadseffektiva och därmed hålla hög konkurrenskraft. Studiens syfte var att identifiera de aspekter som påverkar företagets kapitalbindning och ta fram åtgärdsförslag för att minska kapitalbindningen som orsakas av materialflödet för ett av Kitrons kundprogram inom medicinteknik. Olika metoder användes för att samla in data gällande materialflödet. För att finna åtgärder analyserades materialflödet utifrån insamlad teori och genomförd värdeflödesanalys.

Studien resulterade i identifiering av ett antal aspekter som påverkar kapitalbindningen och utifrån de togs åtgärder fram. De rekommenderade åtgärderna grundas i teori om Lean production. Åtgärdsförslagen bidrar till att effektivisera materialflödet och minimera den totala ledtiden för att reducera kapitalbindningen. Ett effektivare materialflöde kan uppnås genom att producera enligt principerna inom just in time och minimera slöseri. God samverkan med de kunder och leverantörer som påverkar materialflödet är också önskvärt. Den produktstruktur som Kitron utgår ifrån kan även anpassas efter produktionen för att minimera produktionsledtiden.

Sammanfattningsvis krävs en kortare ledtid för att reducera kapitalbindningen inom det studerade kundprogrammet. Med hjälp av en del av de presenterade åtgärdsförslagen skapades ett idealt materialflöde som innebar reducering av produktionsledtiden med 15,5 dagar. Detta skulle medföra en reducering av kapitalbindningen med ungefär 454 000 kronor.

Abstract [en]

This project has been carried out at Jönköping University of Technology. The study has been executed in collaboration with the electronics manufacturing company, Kitron AB. Kitron aims to reduce the capital tied up to be cost efficient and improve the competitiveness. The purpose with this study was to identify the aspects that affect the company´s capital tied up and also find solutions to reduce the capital tied up caused by the material flow. A case study was executed at the company where the study was delimited to one specific customer of Kitron that make biomedical technology. Different methods were being used to gather data which has later been analyzed based on the theoretical framework. To find the solutions and identify the material flow an analyze was executed from theoretical aspects and a value stream map. 

The study resulted in identification of several aspects that affect the capital tied up. From these aspects, solutions were found. The recommended solutions are based on theory about lean production. The solutions contribute to a more efficient material flow and help reduce the total lead time to enable a lower capital tied up. A more efficient material flow can be achieved by producing according to the principles of just in time and by reducing waste. It is preferable to cooperate with customers and suppliers that affect the material flow to improve it. The product structure can be arranged differently to enable a shorter production lead time.

In conclusion, a shorter lead time is necessary to reduce the capital tied up concerning the studied customer. An ideal material flow was created by using some of the suggested solutions, which resulted in a shorter production lead time by 15,5 days. This would also contribute to a reduction of the capital tied up with 454 000 SEK. 

Place, publisher, year, edition, pages
2022. , p. 49
Keywords [en]
Capital tied up, Value stream map, Lean production, Lead time
Keywords [sv]
Kapitalbindning, Värdeflödesanalys, Lean Production, Ledtid
National Category
Mechanical Engineering
Identifiers
URN: urn:nbn:se:hj:diva-57233ISRN: U-JTH-MTA-1-20220298OAI: oai:DiVA.org:hj-57233DiVA, id: diva2:1671184
External cooperation
Kitron AB
Subject / course
JTH, Mechanical Engineering
Supervisors
Examiners
Available from: 2022-06-17 Created: 2022-06-16 Last updated: 2025-10-13Bibliographically approved

Open Access in DiVA

fulltext(1434 kB)263 downloads
File information
File name FULLTEXT01.pdfFile size 1434 kBChecksum SHA-512
a668c0255611ffac3b1c3b0e1d00cb599fbf8af07037d8397d3cd4dced33dbdeb854a734b061ca6e3edfee04e4b07fff3e2ff568b31d2555469b7b45b6000314
Type fulltextMimetype application/pdf

By organisation
School of Engineering
Mechanical Engineering

Search outside of DiVA

GoogleGoogle Scholar
Total: 263 downloads
The number of downloads is the sum of all downloads of full texts. It may include eg previous versions that are now no longer available

urn-nbn

Altmetric score

urn-nbn
Total: 426 hits
CiteExportLink to record
Permanent link

Direct link
Cite
Citation style
  • apa
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Other style
More styles
Language
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Other locale
More languages
Output format
  • html
  • text
  • asciidoc
  • rtf