Ramp-up of a new production system, organisation, and product: Towards an integrated model
Jönköping University, School of Engineering, JTH, Industrial Product Development, Production and Design, JTH, Produktionsutveckling.
Jönköping University, School of Engineering, JTH, Industrial Product Development, Production and Design, JTH, Produktionsutveckling.
2022 (English)Independent thesis Advanced level (degree of Master (Two Years)), 20 credits / 30 HE creditsStudent thesis
Abstract [en]

In today’s global competition, product lifecycles become shorter and new products are released at the market in a rapid pace. A successful ramp-up is vital to reach the target production capacity on time and create a competitive advantage. The complexity of a ramp-up increases with the number of novel factors. This study invented a new term for the novel situation: Ramp-Up of a New Production system, new Organisation and new Product (RUNPOP). The RUNPOP phase starts at Start Of Production (SOP) and ends when target production capacity is reached. The term RUNPOP covers companies with a new organisational structure that produce a new product, in a new production system of which the organisation possesses limited knowledge. A successful RUNPOP phase is defined as reaching target production capacity on time and achieving all initial company-specific objectives. The contribution of this study is guidelines to companies starting a RUNPOP or currently in a RUNPOP by providing several crucial factors and proposals on how to address them. 

 

A case study was conducted to collect data within the topic of RUNPOP, the result has been generalised to be useful for European companies in a RUNPOP. The study had an abductive approach with systematic combination method and used a modified version of a thematic analysis for data analysis. This was combined with literature to analyse the empirical data from interviews and workshops which resulted in crucial factors to consider during a RUNPOP.

 

The seven crucial factors are Flow, Pre-study, Knowledge, Goal, Overall Equipment Effectiveness (OEE), Planning and Organisation. Key findings are that there are commonly uncertainties within a RUNPOP, which requires special treatment. The recommendation is to run the processes at highest possible speed from start in order to shed light on problems earlier. Next proposal is to evaluate if process productivity or process efficiency should be the focus during the specific RUNPOP. Focus should be to develop processes, for example increase OEE and create an efficient flow before adding more shifts to increase the output, which is aligned to the first key finding. Further, knowledge is mostly created by accumulated production in a RUNPOP, employees with collected knowledge are therefore extra valuable. Hence, this study recommends companies to increase team spirit and motivation, but there are many other recommendations available in order to keep employees longer. Finally, the relationship with process suppliers must be open and well developed, process suppliers need to be informed about the complexity of a RUNPOP once initiating the relationship.

Place, publisher, year, edition, pages
2022. , p. 59
National Category
Mechanical Engineering
Identifiers
URN: urn:nbn:se:hj:diva-57592ISRN: JU-JTH-PRS-2-20220104OAI: oai:DiVA.org:hj-57592DiVA, id: diva2:1675054
Subject / course
JTH, Production Systems
Supervisors
Examiners
Available from: 2022-06-23 Created: 2022-06-22 Last updated: 2025-10-13Bibliographically approved

Open Access in DiVA

fulltext(1162 kB)2644 downloads
File information
File name FULLTEXT01.pdfFile size 1162 kBChecksum SHA-512
f0f30230f1664e12aae7bb0d29f67e59d7bbd90c0f582409ce44b855c76fe0f278808b5d707efbde488b46a03c76250ce2f5376d962d876d80c82ef42391d28a
Type fulltextMimetype application/pdf

By organisation
JTH, Produktionsutveckling
Mechanical Engineering

Search outside of DiVA

GoogleGoogle Scholar
Total: 2657 downloads
The number of downloads is the sum of all downloads of full texts. It may include eg previous versions that are now no longer available

urn-nbn

Altmetric score

urn-nbn
Total: 674 hits
CiteExportLink to record
Permanent link

Direct link
Cite
Citation style
  • apa
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Other style
More styles
Language
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Other locale
More languages
Output format
  • html
  • text
  • asciidoc
  • rtf