System disruptions
There are recurring service disruptions on some of the search portals due to high traffic. We are working to resolve the issue, you may temporarily encounter an error message.
Change search
CiteExportLink to record
Permanent link

Direct link
Cite
Citation style
  • apa
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Other style
More styles
Language
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Other locale
More languages
Output format
  • html
  • text
  • asciidoc
  • rtf
Barriers in the Initial Acceptance Phase to Life-Cycle-Assessment: A Case Study of a Swedish Manufacturer
Jönköping University, School of Engineering, JTH, Supply Chain and Operations Management.
Jönköping University, School of Engineering, JTH, Supply Chain and Operations Management.
2023 (English)Independent thesis Basic level (degree of Bachelor), 10 credits / 15 HE creditsStudent thesis
Sustainable development
Sustainable Development
Abstract [en]

Purpose: Sustainability and sustainable manufacturing has grown in importance in recent years, and more legislation and demands are put on organizations to show how their operations affect the environment. Life cycle assessment is a proactive and efficient sustainability tool to report a company’s effects on the environment. Nevertheless, life cycle assessments of products and organizations are complex and require significant resources. Therefore, the purpose of this study is to investigate what potential barriers can occur within the initial acceptance phase when implementing life cycle assessment in the manufacturing industry.

Method: This research project is a single case study of a Swedish manufacturing company. The theory was deduced from literature where eight internal factors influencing the implementation of tools and systems created a foundation for data collection and analysis. Five semi-structured interviews and unstructured observations have been conducted to collect empirical data.

Findings: Nine second-order themes of factors influencing the project as barriers have been identified that construct the three aggregate dimensions ̈Lack of management support ̈, ̈Lack of resources ̈, and ̈Lack of interdepartmental coordination ̈. From the empirical findings, it is also suggested that the three aggregate dimensions are interrelated. The interrelationships are later used to find three change suggestions to mitigate the barriers by using the relationships between the dimensions and targeting as many barriers as possible. Namely, ̈educate top management ̈, ̈enhance the education of project participants ̈, and ̈spend more time on project planning ̈.

Implications: This study provides a deeper and more detailed understanding of different barriers within the initial acceptance phase of a project. It also gives further insights into various interrelationships between barriers and how one dimension can influence the other in both positive and negative ways. Furthermore, this study's findings can guide managers and practitioners in preparing for a project aiming to implement a tool or a system.

Limitations: As in all interpretative research, the interpretations of the empirical data are based on subjective thoughts influenced by the researcher’s positionality, the relationships with the participants, and preconceived perceptions. Furthermore, this research project is a single case study, and the results apply to this case. The findings cannot be statistically generalizable, meaning that the theories and themes created in this report should not be seen as absolute truths but instead as suggestive theories within the field.

Place, publisher, year, edition, pages
2023. , p. 49
Keywords [en]
Barriers, Change Management, Critical success factors, Implementation, Initial acceptance phase, Life Cycle Assessment, Manufacturing, Organizational barriers.
National Category
Other Engineering and Technologies Environmental Management
Identifiers
URN: urn:nbn:se:hj:diva-61898ISRN: JU-JTH-IGA-1-20230279OAI: oai:DiVA.org:hj-61898DiVA, id: diva2:1780377
External cooperation
Industrilås AB
Subject / course
JTH, Industrial Engineering and Management
Available from: 2023-07-07 Created: 2023-07-05 Last updated: 2025-10-13Bibliographically approved

Open Access in DiVA

fulltext(2678 kB)387 downloads
File information
File name FULLTEXT01.pdfFile size 2678 kBChecksum SHA-512
32e4831c163e66f56a7b367d4e8bf3a25cfefb7e47bbe24a6c68621f89afbffd6ef18eadad04ba3d724dadac8406567d09fa0445817c1dd6e323a13877b5bdb1
Type fulltextMimetype application/pdf

Search in DiVA

By author/editor
Chandok, IshaanSamuelsson, Martin
By organisation
JTH, Supply Chain and Operations Management
Other Engineering and TechnologiesEnvironmental Management

Search outside of DiVA

GoogleGoogle Scholar
Total: 390 downloads
The number of downloads is the sum of all downloads of full texts. It may include eg previous versions that are now no longer available

urn-nbn

Altmetric score

urn-nbn
Total: 966 hits
CiteExportLink to record
Permanent link

Direct link
Cite
Citation style
  • apa
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Other style
More styles
Language
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Other locale
More languages
Output format
  • html
  • text
  • asciidoc
  • rtf