Change search
CiteExportLink to record
Permanent link

Direct link
Cite
Citation style
  • apa
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Other style
More styles
Language
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Other locale
More languages
Output format
  • html
  • text
  • asciidoc
  • rtf
Minska miljöpåverkan och utgifterna: optimera tillgodogörande av spillmaterial
Jönköping University, School of Engineering, JTH, Construction Engineering and Lighting Science.
Jönköping University, School of Engineering, JTH, Construction Engineering and Lighting Science.
2023 (Swedish)Independent thesis Basic level (degree of Bachelor), 10 credits / 15 HE creditsStudent thesis
Sustainable development
Sustainable Development
Alternative title
Reduce the environmental impact and the expenses: optimize utilization of waste material (English)
Abstract [en]

Introduction – The construction sector accounts for 40 % of all the waste in Sweden. The negative climate impact is increasing successively and to keep global warming below 2,4 – 2,6 degrees Celsius, climate measures are required. Waste reduction is a central part of preventing climate impact. The aim of the study is to find an approachof waste management in the production of industrial buildings that is economically and environmentally beneficial. The aim is to reduce the construction sector´s climate footprint by encouraging a change in waste management that is economically favorable for the companies. The study is carried out in collaboration with YLAB Larssons Bygg AB (YLAB). 

Method – The method for the report is a case study, where the production of two industrial buildings are analyzed. The study is quantitative because it is mainly based on statistics and aims to identify economic consequences through waste statistics. In addition, it is qualitative in order to create a deeper understanding. To increase the credibility of the study, triangulation is used where document study, observation and interview are the data collection techniques. To increase validity, the study is based on contemporary and scientific sources.

Results – The observation showed that the construction sites were organized, however, the waste containers were difficult to access from the ground and had inadequate signage. There were piles of leftover material from cut outs that went to waste, but there were also defective materials due to inadequate packaging.The interview showed that it was beneficial to have a waste manager on site. It was also found that the existing signage provided by PreZero (waste management company) was inadequate due to size and language barriers present at the construction site. The site managers did not work actively to identify areas for improvement of waste management.The document study showed that the total amount of waste on project A so far was circa104 tons, with a cost of circa SEK 150 000. Project B had a waste amount and a cost of circa 62 tons and SEK 120 000. The most expensive treatments were for mixed waste and the largest proportion of waste was wood on both projects. The recycling rate never exceeded 55 % on any of the projects, while the source sorting rate varied between 39- 100 %.

Analysis – In the event of early delivery, the material may be placed incorrectly and thus runs a greater risk of being damaged during transportation. In the months when the amount of waste was less, the costs for waste management were lower and when the amount of mixed waste was high, the source sorting rate was low.

Discussion – There is a clear improvement potential for the labeling of containers. Knowledge of waste management is a key factor for the waste to be sorted correctly and the amount of waste to be reduced. Good packaging can result in less defective materials, which leads to less waste. Costs are reduced by reducing waste quantities, but also by moving waste higher up in the waste hierarchy.

Keywords: Mixed waste, Recycling, Treatment, Waste hierarchy, Waste management

Place, publisher, year, edition, pages
2023. , p. 51
Keywords [sv]
Avfallshantering, Avfallshierarkin, Behandling, Blandat avfall, Återvinning.
National Category
Construction Management
Identifiers
URN: urn:nbn:se:hj:diva-62419ISRN: JU-JTH-BTA-1-20230530OAI: oai:DiVA.org:hj-62419DiVA, id: diva2:1796137
External cooperation
YLAB Larssons bygg AB
Subject / course
JTH, Civil Engineering
Supervisors
Examiners
Available from: 2023-09-26 Created: 2023-09-11 Last updated: 2026-03-12Bibliographically approved

Open Access in DiVA

fulltext(2300 kB)168 downloads
File information
File name FULLTEXT01.pdfFile size 2300 kBChecksum SHA-512
d79e307022b0c7524577ded19483c065db384da3f1a5de8dbd5d00daceb9b50a2a958a8f5ebdaf8cebafde8cc9a6a101caf7eae3508a86c93b757180fc3e71c5
Type fulltextMimetype application/pdf

Search in DiVA

By author/editor
Jonsson, AngelinaPanboon, Wilma
By organisation
JTH, Construction Engineering and Lighting Science
Construction Management

Search outside of DiVA

GoogleGoogle Scholar
Total: 170 downloads
The number of downloads is the sum of all downloads of full texts. It may include eg previous versions that are now no longer available

urn-nbn

Altmetric score

urn-nbn
Total: 568 hits
CiteExportLink to record
Permanent link

Direct link
Cite
Citation style
  • apa
  • ieee
  • modern-language-association-8th-edition
  • vancouver
  • Other style
More styles
Language
  • de-DE
  • en-GB
  • en-US
  • fi-FI
  • nn-NO
  • nn-NB
  • sv-SE
  • Other locale
More languages
Output format
  • html
  • text
  • asciidoc
  • rtf